Riverview

A renovation of a cottage.

Shed is wired up and workable

By ferg at 7:17 pm on Sunday, November 15, 2009

The electrician came on Friday to do the second fix. I’d previously finished the floor, forgetting to take pictures, on weds.

Shed

I have a proper ring main with a 30amp box. Ten double sockets, and 2 lights on a separate circuit, and also an external PIR. IF you are interested click through on an image and you’ll see the wires in the ‘Don’t Cut Through Wiring’ set.

Now that the electricity was live I could start working on making this into a proper office. That is finish the networking, and get myself a desk! I intend to use some 2×3 timbers and a solid wood kitchen worktop to make a desk, but in the meantime I used some of the surplus flooring chipboard and two trestles. Seems solid enough!

Shed

Shed

Share and Enjoy:
  • Digg
  • del.icio.us
  • Facebook
  • Google Bookmarks
  • Technorati
Filed under: Uncategorized Leave A Comment »

No Comments »

No comments yet.

RSS feed for comments on this post.

Leave a comment

 

Bad Behavior has blocked 18 access attempts in the last 7 days.